Overview:

Standard Demolition has been contracted to undertake a unique, complex project at CSUCI, where we’ll be demolishing selected parts of an old, unused building originally part of a mental hospital. The challenge involves not only safely taking down the obsolete sections but also carefully preserving other parts of the structure for future use.

Objectives:

  • Safely dismantle and remove sections of the old building that have been earmarked for demolition.
  • Maintain the structural integrity of portions of the building that are to be preserved.
  • Dispose of all waste materials in an environmentally responsible manner.
  • Ensure minimum disruption to campus activities during the project.

Key Tasks:

  1. Initial Assessment & Planning: Conduct a thorough structural assessment to identify which sections are to be demolished and which are to be preserved.
  2. Asbestos and Hazardous Material Abatement: Before any demolition activities, ensure any hazardous materials are identified and properly removed.
  3. Selective Demolition: Using state-of-the-art tools and techniques, carry out the demolition of specific parts of the building while ensuring the safe preservation of the remaining structure.
  4. Material Sorting and Recycling: Sort all recyclable materials and dispose of waste in accordance with local and federal regulations.
  5. Site Cleanup: Upon completion of demolition activities, the site will be cleaned and prepared for any future construction or landscaping activities.
  6. Final Inspection: Conduct a final site inspection to ensure all objectives have been met, followed by handover to the client.

Safety Measures:

  • All work will be conducted following strict safety guidelines and in compliance with all local and state regulations.
  • Necessary barricades and warning signs will be installed to protect students, staff, and visitors on campus.

Project Details